Renovating a bathroom: the order of works

Bathroom with blue graphic tiles and oval mirrors framed in brass, renovated by Pollux

Removal, services, waterproofing, tiling, furniture and finishes: the sequence of works in a bathroom, and the decisions to make before the project starts.

A bathroom is a small room where almost every trade is involved. The order of works matters as much as the choice of materials.

1. Decide before demolishing

Shower or bath, position of the basin, WC and heated towel rail, storage, mirror lighting: these choices set the route of the pipes and cables. They are made before removal.

2. Removal and services

After the fittings and coverings are removed, the plumbing and electrics are redone. On the electrical side, the safety zones around the shower and bath guide the position of sockets and light fittings.

3. Substrates and waterproofing

The walls and floor are prepared, then a waterproofing layer is applied in exposed areas, especially around a walk-in shower.

4. Coverings, furniture and finishes

Next come the wall and floor tiles, then the furniture, taps, shower screens, mirrors, painting and joints. The water is turned back on and everything is checked at handover.

See the electrical safety zones of the bathroom and bathroom renovation with Pollux.