Bathroom
Renovating a bathroom: the order of works

Removal, services, waterproofing, tiling, furniture and finishes: the sequence of works in a bathroom, and the decisions to make before the project starts.
A bathroom is a small room where almost every trade is involved. The order of works matters as much as the choice of materials.
1. Decide before demolishing
Shower or bath, position of the basin, WC and heated towel rail, storage, mirror lighting: these choices set the route of the pipes and cables. They are made before removal.
2. Removal and services
After the fittings and coverings are removed, the plumbing and electrics are redone. On the electrical side, the safety zones around the shower and bath guide the position of sockets and light fittings.
3. Substrates and waterproofing
The walls and floor are prepared, then a waterproofing layer is applied in exposed areas, especially around a walk-in shower.
4. Coverings, furniture and finishes
Next come the wall and floor tiles, then the furniture, taps, shower screens, mirrors, painting and joints. The water is turned back on and everything is checked at handover.
See the electrical safety zones of the bathroom and bathroom renovation with Pollux.
Sources
Further reading
- Preparing the full renovation of an apartment or a house
- Renovating an older apartment while preserving its mouldings
- Bespoke joinery or standard furniture: how to choose?
- Renovating an apartment in a shared building: what to know before the works
- Electrics in the bathroom: understanding the safety zones
- Installing an interior glass partition: the right questions to ask
- Kitchen electrics: sockets and circuits to plan
- Chevron, herringbone, straight lay: recognising parquet patterns