Skip to content
Menu FR

Method

Preparing the full renovation of an apartment or a house

Living room open to the kitchen with a glass partition, renovated by Pollux

The steps to prepare a full renovation: defining the scope, gathering the documents, ordering the works, reading a detailed quote.

A full renovation often succeeds or fails before the first hammer blow. The most useful thing is not to know everything in advance, but to prepare the right information so that the quote truly matches your project.

1. Describe what isn't working, then what you want

Start with how you use the space rather than with solutions: a kitchen that is too closed off, a bathroom that is no longer enough, storage you can never find, cold rooms. Then note what you would like: an open room, a bookcase, parquet, colours. These two lists are the basis of the first conversation.

2. Gather the documents

  • Photos of every room, including the consumer unit and the water supplies.
  • The plans of the home if you have them (deed of sale, estate agent, building management).
  • In a shared building, the building regulations: some works require approval from the general meeting of co-owners.
  • The surveys carried out at purchase, which tell you about the condition of the property.

3. Understand the order of works

The trades follow one another: demolition and strip-out, then partitions and services (electrics, plumbing), insulation, plastering, floors, joinery, and finally painting and finishes. Bespoke pieces are designed early, because they determine where sockets, lighting and sometimes partitions go.

That is the value of an all-trades general contractor: one point of contact organises this sequence instead of leaving it to you.

4. Read a detailed quote

A useful quote reads item by item: what is demolished, what is created, the materials and their references or ranges, the finishes, what is excluded. Ask about every unclear line. Compare quotes on an equal scope, not just on their total.

5. Plan for life during the works

Occupied or empty home, access, furniture storage, a period without a kitchen or bathroom: these questions are settled before the works start and shape the phasing.

Present your full renovation project: the guided request covers exactly these points.


Further reading

WhatsAppMessage Ionuț Mircea

Search the site

pollux.d3sign